Hyperion – Chapter 5 – Stay on target

After a week away up in Port Macquarie helping with the construction of a Farrier F22R. It was time to get back in the shed to get some work done.

The final frame has gone in, and been tagged, and I have almost finished work on the rudder adjuster and I started the bow forestay “fitting”, which has been built using an identical method to the chainplates on the F22R, although it has been rotated 90 degrees.

IMG_0002 IMG_0001

I also thought it would be a good time to “hit the scales” and the hull, with all the frames and CB case is 7.2kg, light enough to be lifted by my little helper (just).

IMG_0048 IMG_0010

I have 2 weeks of leave before I start my new job so the push is now really on to get the deck fitted ASAP.

 

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>